NR Class Locomotives

 

ALL IMAGES FEATURED ARE COPYRIGHT (C) OF MAIKHA "V" LY, 2000-2001-2002-2003

PERMISSION AND CREDIT MUST BE GIVEN FOR THESE PHOTOGRAPHS TO BE USED.

 

(Top and Bottom-Left): NR113 which led the Sydney bound Indian Pacific (5AS8) detached from the train and ran ahead onto platform 2. (More info on following caption).

(Middle-Left): The newly applied Pacific National logo, in place of the former National Rail signage.

 

1/5/04

(All): Due to the short length of platforms 2 and 3, and the long length of the Indian Pacific consist, two locomotives are required for complicated shunting moves. The first locomotive (NR113) is moved ahead of the train, whereas a second locomotive (DL49, pictured below) moves one half of the Indian Pacific to arrive onto Platform 3.   

After the front half is moved onto the platform, the leading locomotive is returned back to the second half of the divided train, and is then moved onto another platform (Platform 2). 

 

(Top-Left): DL49 arrives into Platform 3 with the first half portion of the Indian Pacific from Perth.

(Middle-Left): The two locomotives which lead the Indian Pacific (NR113 and DL49) are seen passing each other on platforms 2 and 3.

(Bottom-Left): NR113 on platform 2 and DL49 on platform 3 after arriving with their respective halves of the Indian Pacific.

 

1/5/04

NR117 and NR108 pass 4401 at Robertson station on an Up freighter. 

 

21/4/04

NR117 and NR108, as previously seen back at Robertson, await in the loop between Mt Murray and Summit Tank, as it is overtaken by Sydney return The Cockatoo Run (CL-2).

 

21/4/04

NR 28 passes Dulwich Hill light engine to Chullora after completing an Indian Pacific duty.

 

20/8/03

NR121 (Formerly NR3 - Rebuilt after the Robertson accident in 1998) passes Canterbury light engine to Chullora after completing an Indian Pacific duty.

 

23/1/03

NR 21 hauls a Perth-bound WL-1 Indian Pacific through Redfern. 

 

14/11/02

An NR freighter consisting of NR 9, NR 57 and NR117 passes Beresfield Station on a Melbourne to Brisbane Freighter.

 

(Top and Bottom-left) NR 9, 57 and 117 speed through Beresfield bound for Brisbane.

 

12/10/01

NR 42 seen here on the road in between platforms 4 and 3, shunting the Indian Pacific.

 

1/10/01

At Sydney Terminal, around 4-5 NR Locomotives were sprawled around platforms 1-3.

In the foreground NR 42 and underexposed on Platform 2 NR84.

 

1/10/01

Melbourne to Brisbane freighter, led by NR90 speeds through Wondabyne Platform.

 

16/7/01

NR 116 haul Great Southern Railway's "The Ghan" as run WL-4 through Mt Victoria.

 

10/6/01

 

<< BACK to Locomotives